The 4th Board discussed: balance model developed by RFVG and University of Trieste for the Region, some work proposal for the model TRUST specific to the studied area and model results relative to climate change.

The 4th Technical Board, set up under the TRUST project, was held in Venice at the River Basin Authority headquarter on October 26, 2010 at 10:00 am. The board began with a screening of the short shot at thetraveling 1st TRUST workshop, held May 13, 2010.
| |
| At the end of each intervention, several suggestions have been acquired and the different methodological aspects andapplications of the studies presented have been discussedin a proactive, interactive and multidisciplinary way, with the cooperation and participation of many stakeholdersincluding technicians (over 30 partecipants). | |
To the right GALLERY of some significant images and photos. | |
| LIST OF PARTECIPANTS | |
| ARPA Veneto | Cons. Bonifica Piave |
| ARPA Friuli Venezia Giulia | Cons. Bonifica Brenta |
| Regione Veneto | Provincia di Vicenza |
| Regione Friuli Venezia Giulia | Autorità di bacino regioNale FVG |
| DIGEO - Università di Trieste | PARTNERS |
| Cons. Bonifica Ledra-Tagliamento | Autorità di Bacino dell'Alto Adriatico |
| Cons. Bonifica Cellina Meduna | CMCC |
| SGI - Studio Galli Ingegneria Spa | |
DOWNLOAD MATERIALS Current folder: TavoloTecnico
2010-10-26
File name
Size
Last changed

2010-10-26_cmcc-Bellucci_modclimatici.pdf 2,03 MB 27/10/2010 13:05:29 
2010-10-26_sgi-marsala_modbilancio.pdf 8,25 MB 27/10/2010 10:24:24
| < Prev | Next > |
|---|
